Keystone School: Before / After

We checked in on one of our recent projects in San Antonio and
we’re so happy with how it’s filling in. The project, which was completed in
2014, consisted of creating a flexible, central quad out of the leftover
backyards of the former residences that make up Keystone School. In
collaboration with HIWorks Architecture, we transformed an asphalt yard into a
green amphitheater that encourages students to play, learn, perform, and
socialize in the space. Educational components include rainwater harvesting,
rain gardens, and drought-tolerant plantings.

 

AERIAL – BEFORE

 

 

AERIAL – AFTER

 

BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
AFTER
AFTER
Tags: , , , , ,

Comments are closed.